Bill of Quantities

Know what your project costs, item by item — before you sign, and every month after.

Overview

What our bill of quantities service covers

A bill of quantities turns a design into a measured, priceable schedule of everything the project requires. It is what lets you compare tenders on a like-for-like basis, challenge a variation with evidence, and know where the money has actually gone.

We prepare cost estimates and bills of quantities, produce tender documentation, and provide the ongoing cost control and value engineering support that keeps a project inside its budget rather than merely reporting that it left.

Why engage us

Five reasons clients bring bill of quantities to TopHall

  • Measured quantities, not rules of thumb

    Costs are built from measured work rather than rate-per-square-metre approximations, which is the difference between a budget and a hope.

  • Tenders you can actually compare

    Proper tender documentation forces bidders to price the same scope, exposing the low bid that has simply omitted work.

  • Variations assessed on evidence

    When a contractor claims a variation, it is measured and checked against the bill rather than negotiated on assertion.

  • Value engineering that keeps the design intent

    Where savings are needed we identify them against buildability and specification, instead of simply stripping quality out of the finishes.

  • Cost control through to final account

    Cost is tracked for the life of the project, so the final account is a confirmation rather than a surprise.

How it works

Our process

Each stage has a defined output, so you always know what you are receiving and what happens next.

  1. Step 01

    Drawing review

    We review the design and identify what can be measured and what needs clarification.

  2. Step 02

    Measurement

    Quantities are taken off and the bill is compiled.

  3. Step 03

    Cost estimate

    Rates are applied to produce a realistic project cost.

  4. Step 04

    Tender documentation

    Documents are issued so contractors price a consistent scope.

  5. Step 05

    Cost control

    Valuations, variations, and the final account are managed through construction.

Questions

Frequently asked questions

Can you prepare a bill of quantities from another firm's drawings?

Yes. We will review the drawing set first and tell you where it lacks the detail needed for accurate measurement.

How accurate is the initial cost estimate?

Accuracy depends on how developed the design is. We state the basis and the expected range rather than presenting an early-stage figure as a fixed price.

Do you provide quantity surveying during construction?

Yes — interim valuations, variation assessment, cost reporting, and final account are part of our cost control service.

Need bill of quantities for your project?

Tell us the site, the scope and the budget range. You'll get a considered response from a qualified engineer — not a call-centre callback.