Civil & Water Engineering · Nairobi

Civil and Water Engineers in Nairobi

Site infrastructure designed properly — earthworks and levels, internal roads, drainage, water reticulation and external works — for developments, estates and institutional sites.

Engineering disciplines in-house
3
Incorporated in Kenya
Est. 2017
Combined team experience
10+ yrs

Talk to a civil engineer

Four fields. You'll hear back within one business day, from someone who can answer technical questions.

No obligation, and your details are not shared with anyone.

Registered and compliant with

  • National Construction Authority
  • National Environment Management Authority (NEMA)
  • Engineers Board of Kenya

The half of a development nobody photographs

The buildings get the attention. The site infrastructure decides whether it works

On a multi-unit development, the roads, the drainage, the water reticulation, the sewer runs and the earthworks routinely account for a substantial share of the cost and almost all of the problems that appear in the first two years. They are also the part most often designed last, by whoever is available, against the layout rather than against the levels.

The consequences are specific and familiar. An internal road that ponds. A drainage run laid to a fall that does not exist. A sewer that needs pumping because the levels were never checked against the connection point. Reticulation that loses pressure at the top of the site.

None of those are construction failures. They are design failures, and they are all avoidable by doing the civil engineering as engineering — surveyed levels, calculated catchments, sized pipes — before the earthworks start rather than after.

What we are called in for

Five civil engineering problems on Nairobi developments

Usually after the earthworks are done, which is the expensive time to find them.

  • Levels set without a survey

    Everything downstream of the earthworks — road falls, drainage gradients, sewer connections, building platforms — depends on levels being right. They are surveyed, not eyeballed.

  • Drainage sized for the plot, not the development

    Roofs, roads and paving convert rainfall into runoff. Capacity has to be calculated for the developed catchment, not the field it used to be.

  • Roads built without a pavement design

    Subgrade condition, traffic loading and drainage determine the build-up. An internal road laid to a standard section on black cotton soil will fail within two rainy seasons.

  • Sewers that will not fall to the connection

    Invert levels at the connection point govern everything upstream. Checking them early is free; discovering the problem after laying is not.

  • Reticulation with no pressure at the top

    Head, friction and demand across a sloping site is a calculation. Without it, the upper units are permanently disappointed.

What we design

Site infrastructure and external works

As a consulting appointment, or designed and delivered.

  • Drainage & Stormwater

    Catchment analysis, channel and pipe sizing, detention and discharge for the developed site.

  • Water Reticulation & Sewerage

    Distribution, storage, pressure zones, sewer runs and connection levels across a development.

  • Earthworks, Levels & Retaining

    Cut and fill, platform levels, and retaining structures designed rather than improvised on a sloping site.

  • Roads & External Works

    Internal roads, pavement build-up, parking, hardstanding, kerbs and surface finishes.

  • Supervision & Inspection

    Levels, falls, bedding and compaction checked on site before anything is backfilled.

How a civil appointment works

Survey first, always

Six stages, and the first one is not negotiable.

  1. Topographic survey

    Actual levels across the site, plus the invert levels at every connection point you will be discharging to.

  2. Ground investigation

    Subgrade conditions and soil behaviour, which govern pavement design, foundations and soakage.

  3. Layout & levels design

    Platform levels, road alignment, cut and fill balanced to reduce the volume of material moved.

  4. Services design

    Drainage, water, sewerage and their interactions, sized and coordinated so nothing clashes underground.

  5. Documentation

    Drawings, details and a measured bill of quantities for the civil works.

  6. Construction supervision

    Setting out, levels, falls, bedding and compaction inspected before backfill.

Why TopHall

Consulting civil engineering, not a contractor's drawings

The independence is part of what you are buying.

  • Water resource engineering in-house

    One of our three engineering disciplines. Drainage, reticulation and hydraulics are designed here rather than subcontracted to a specialist we cannot question.

  • Structural design in the same practice

    Retaining walls, culverts and chambers need structural design, and on a sloping Nairobi site there are usually several.

  • Design available without construction

    You can take our drawings and bill of quantities and tender the works to anyone. Supervision is separately available if you want the build checked.

  • Levels treated as the foundation of everything

    We will not design drainage or roads off an assumed level, because every error there multiplies through the rest of the site.

  • Environmental requirements handled

    Discharge, watercourses and earthworks frequently bring environmental obligations. EIA is one of our own services.

Our work

Groundworks and structures

Photographs from TopHall sites showing civil works in progress, each captioned for what it is.

  • Natural stone strip foundations under construction on a building site, with workers setting out the coursingSite photograph

    Excavation and stone foundations set out to surveyed levels.

  • Masonry walls under construction rising from a natural stone strip foundation on a building siteSite photograph

    Masonry construction on completed substructure — the same techniques used for chambers and retaining works.

  • Suspended block-and-beam floor slab under construction with reinforcement mesh laid out ready for pouringSite photograph

    Reinforced concrete construction on a TopHall site.

Before you call

What developers ask a civil engineer

Do I need a topographic survey before you can design anything?

For anything involving drainage, roads or levels, yes — and it is the single best-value item on a civil engineering budget. Every gradient, every fall and every platform level depends on knowing where the ground actually is. Designing off assumed levels produces drawings that look fine and cannot be built, which is discovered during earthworks at considerable cost.

Can you design the civils if someone else is doing the buildings?

Yes, and it is a common arrangement. Site infrastructure is a distinct discipline and there is no reason it has to come from the same practice as the buildings. We would need the building layout and finished floor levels from the architect, and we would coordinate with them on where services enter each unit.

How much of a development's budget goes on external works?

It varies enormously with the site, and that variation is the point. A flat plot with a road frontage and a nearby sewer connection is at one end; a sloping site needing cut and fill, retaining structures, a long access road and pumped drainage is at the other, and can consume a share of the budget that surprises people. Establishing which of those you have, early, is exactly what the survey and ground investigation are for.

Need civil engineering on a development?

Tell us about the site — size, slope, what is going on it and where it can discharge to. We will tell you what the civils involve.