Skip to main content

Quantity Surveying · Kenya

Quantity Surveying in Kenya: Credentials and Measurement

Bills of quantities, valuations, tender documentation and cost control — plus a clear answer on which submissions on your project require an endorsement from a registered professional.

Service lines under one contract
7
Incorporated in Kenya
Est. 2017
Combined team experience
10+ yrs

Send us your drawings

Four fields. You'll hear back within one business day, from someone who can answer technical questions.

No obligation, and your details are not shared with anyone.

Registered and compliant with

  • National Construction Authority
  • National Environment Management Authority (NEMA)
  • Engineers Board of Kenya

Two different questions

Whether the measurement is good, and whether the signature is required

People searching for a certified quantity surveyor are usually trying to answer one of two questions, and they are not the same. The first is whether the measurement will be accurate and defensible. The second is whether a particular document — a submission, a lender's requirement, a tender return — has to carry the endorsement of a professional registered with the Board of Registration of Architects and Quantity Surveyors.

The second question is worth settling explicitly at the start of a project. Registration attaches to individuals, and the requirement attaches to specific documents rather than to the appointment as a whole, so the useful thing to establish is which of your documents need it and who will sign them.

The first question is about the work itself, and it is the one that decides whether your budget holds. TopHall Group provides bill of quantities and cost management as one of its seven service lines, measured by a practice that also does the structural design and the construction.

What weak measurement costs

Five failures that a credential alone will not prevent

Check the registration where it is required. Then check the work.

  • A bill built from provisional sums

    Deferring measurement rather than doing it moves the cost into variations, which is where budgets are lost regardless of who signed the document.

  • Quantities that do not match the drawings

    Measured from a superseded drawing set, a bill is worse than useless because everyone trusts it. Traceable measurement is the safeguard.

  • Substructure not properly measured

    Excavation and foundations are the largest variable on most Kenyan projects and the item most often carried as an allowance.

  • Valuations certified without site measurement

    Payment against invoices rather than measured work is how projects end up substantially paid and considerably less built.

  • A document nobody uses after the tender

    If variations are not measured against the bill, most of its value was never collected.

What we produce

Cost management, measured properly

Available standalone, on projects other firms are designing and building.

  • Bills of Quantities

    Element-by-element measurement taken off your drawings, with quantities traceable to the dimension they came from.

  • Cost Plans & Estimates

    Early budget estimates and developed elemental cost plans as the design firms up.

  • Tender Documentation & Analysis

    Documents that let you run a fair tender, and a comparison of returns item by item rather than by total.

  • Valuations & Final Accounts

    Interim valuations measured on site, variations priced against the bill, and a final account you can defend.

  • Technical Review

    Drawings checked for completeness before measurement, so gaps surface on paper rather than in the final account.

How an appointment starts

Six steps, credentials settled first

The registration question is answered before any measurement is done.

  1. What the document is for

    Tendering, a lender's requirement, a statutory submission or cost control — each has different requirements.

  2. Establish any endorsement requirement

    Whether the document must be signed by a professional registered with the Board, and confirm that is covered.

  3. Drawing review

    What can be measured, what cannot, and what must be carried as a stated assumption.

  4. Measurement

    Element by element, with every quantity traceable back to its source drawing and dimension.

  5. Pricing & issue

    Current Nairobi rates applied item by item, issued with an elemental summary and a walkthrough.

  6. Use through construction

    Valuations and variations measured against the same document, which is where most of its value sits.

Why TopHall

What you can check, and what we will tell you

Both matter more than a claim on a page.

  • We are clear about what we are

    TopHall's team are civil engineers. Bill of quantities and cost management is one of our seven service lines. Where a document requires an endorsement from a professional registered in another discipline, we identify it and confirm it is covered.

  • Measurement you can audit

    Quantities tied back to the drawing and dimension they came from, so any figure can be checked rather than trusted.

  • Rates from live projects

    We procure materials on our own sites, so the pricing reflects what things cost now rather than a published index.

  • Drawings read by engineers

    Measuring with structural knowledge catches what the drawings have not resolved instead of converting it into a provisional sum.

  • Independent where you need it

    On projects we are not building we have no interest in any particular number, which is precisely when a measurement is most useful.

Our work

The elements that get measured

Photographs from TopHall sites and a structural visualisation by our team. Each is labelled for what it is.

  • Natural stone strip foundations under construction on a building site, with workers setting out the coursingSite photograph

    Substructure — excavation, stone and concrete, measured as separate items because each carries its own rate.

  • Suspended block-and-beam floor slab under construction with reinforcement mesh laid out ready for pouringSite photograph

    Slab construction: concrete volume, formwork area and reinforcement tonnage, each measured independently.

  • Architectural visualisation of a multi-storey reinforced concrete frame showing columns, beams and floor slabsDesign visualisation

    The structural design quantities are taken off.

Before you call

What clients ask about QS credentials

Does my bill of quantities have to be signed by a registered quantity surveyor?

It depends on what the document is for. A bill produced for your own budgeting or for comparing contractor quotes generally does not carry a statutory endorsement requirement. Documents forming part of certain statutory submissions, or required by a particular lender or public procurement process, may. The right move is to establish the requirement for your specific document at the start, which we do as a matter of course before beginning work.

Is TopHall Group registered with BORAQS?

TopHall's team are civil engineers specialising in structural, environmental and water resource engineering, and bill of quantities and cost management is one of our seven service lines. Registration with the Board of Registration of Architects and Quantity Surveyors attaches to individual professionals. Where your project has a document that requires such an endorsement, we identify it at the outset and confirm that the requirement is covered on the team before the work proceeds.

Can you check a bill of quantities somebody else prepared?

Yes, and it is worth doing before you tender rather than after. We check it against the drawings for completeness and accuracy, and flag provisional sums that should have been measured, quantities that do not reconcile, and items that are missing. That review is inexpensive relative to the cost of tendering against a document with a hole in it.

Need measurement you can rely on?

Send the drawings and tell us what the document is for. We will confirm what the submission requires and what the measurement involves.

Prefer to talk now? Call +254 742 147 558.