Skip to main content

Bill of Quantities · Kenya

Bill of Quantities Preparation in Kenya

Measured, itemised and priced element by element from your drawings — the document you tender against, borrow against and control the job with.

Service lines under one contract
7
Incorporated in Kenya
Est. 2017
Engineering disciplines in-house
3

Request a BoQ

Four fields. You'll hear back within one business day, from someone who can answer technical questions.

No obligation, and your details are not shared with anyone.

Registered and compliant with

  • National Construction Authority
  • National Environment Management Authority (NEMA)
  • Engineers Board of Kenya

What a BoQ is actually for

One document that does four different jobs

People usually come looking for a bill of quantities for one reason — a bank has asked for one, or three contractors have returned three incomparable quotes. It is worth knowing that the same document does several other things once it exists.

It is the tender document, so every contractor prices identical scope. It is the lender's evidence that the figure is real. It is the control document during construction, because valuations and variations are measured against it. And at the end it is the basis of the final account, which is the point at which a project either settles cleanly or does not.

TopHall Group prepares bills of quantities as a standalone service, including for projects other firms are designing and building. The measurement is done by a practice that also does the structural design, which tends to mean the bill catches what the drawings left out.

What a bad BoQ costs

Five ways a bill of quantities fails you

A bill is only useful if it is complete, measured and specific. Many are none of the three.

  • Provisional sums standing in for measurement

    A bill made largely of provisional sums has not measured the building, it has deferred measuring it. Those items are where the final account grows.

  • Items with no specification attached

    "Floor finish" priced without saying which finish means every contractor priced a different one, which is what you were trying to avoid.

  • Substructure guessed rather than measured

    Excavation and foundations depend on ground conditions and levels. Without those, the largest single variable in the job is an assumption.

  • Quantities that do not match the drawings

    A bill measured from an outdated drawing set is worse than no bill, because everyone believes it.

  • A bill nobody uses after the tender

    If valuations and variations are not measured against it, the document did a quarter of its job and the control it was supposed to give you was never used.

What you receive

What is in the document we produce

Prepared for tendering, for financing, or for controlling a job already under way.

  • Measured Bill of Quantities

    Itemised by element — substructure, frame, walling, roofing, finishes, services, externals — with quantities taken off your drawings.

  • Priced Summary

    Current Nairobi market rates applied, with a summary by element so you can see where the money actually is.

  • Tender Documentation

    Preliminaries, specification notes and the schedules a contractor needs in order to price properly.

  • Tender Analysis

    Returned bids compared item by item, with the differences explained rather than just totalled.

  • Drawing Review

    A check of what the drawings actually resolve before measurement starts, so gaps surface on paper rather than in the final account.

How preparation runs

From drawing set to priced bill

Six steps, with the assumptions written down at every point.

  1. Drawings received

    Architectural, structural and services drawings, plus any specification or finishes schedule.

  2. Completeness review

    What can be measured, what cannot, and what has to be carried as a stated assumption.

  3. Taking off

    Element-by-element measurement, with dimensions traceable back to the drawing they came from.

  4. Pricing

    Rates from current Nairobi material and labour costs, applied item by item rather than as a blanket.

  5. Issue & walkthrough

    The priced bill and an element summary, with a conversation about where the cost sits and why.

  6. Use in tender or construction

    Issued to contractors for pricing, or used as the measurement basis for valuations and variations.

Why TopHall

What you get from an engineering practice measuring it

The difference shows in what the bill includes.

  • Gaps in the drawings get flagged

    Measuring with structural knowledge means noticing what has not been designed yet, rather than quietly turning it into a provisional sum.

  • Substructure measured properly

    Excavation, ground conditions and foundation type are the largest cost variable on most Kenyan projects, and the one most often fudged.

  • Rates from projects we are buying for

    We procure materials on our own sites, so the pricing reflects what things cost this month rather than last year.

  • Traceable measurement

    Quantities tied back to the drawing and dimension they came from, so any figure can be checked rather than taken on trust.

  • Usable after the tender

    Structured so valuations and variations can actually be measured against it, which is where most of its value is.

Our work

The elements a bill measures

Photographs from TopHall sites and a structural visualisation produced by our team. Each is captioned for what it is.

  • Natural stone strip foundations under construction on a building site, with workers setting out the coursingSite photograph

    Substructure: excavation, stone and concrete — measured separately because each carries a different rate.

  • Masonry walls under construction rising from a natural stone strip foundation on a building siteSite photograph

    Walling measured by area, with openings deducted and lintels itemised.

  • Suspended block-and-beam floor slab under construction with reinforcement mesh laid out ready for pouringSite photograph

    Suspended slab: concrete volume, formwork area and reinforcement tonnage, each a separate bill item.

Before you call

What people ask about BoQ preparation

How long does a bill of quantities take to prepare?

For a house with complete drawings, typically one to two weeks. For a larger commercial or multi-storey project, longer, and the timing depends far more on how complete and coordinated the drawings are than on the size of the building. We will give you a date when we have seen the drawing set, not before.

My bank has asked for a BoQ. Does that need anything specific?

Lenders generally want an itemised, priced document that demonstrates the construction figure is measured rather than estimated, and they often want it structured so that drawdowns can be released against completed elements. Tell us which bank and what they have asked for, and we will format it to suit — it is the same measurement either way, presented for its purpose.

Can you prepare a BoQ if my drawings are not finished?

We can produce a budget estimate, and we will be explicit about which parts are measured and which are assumed. What we will not do is present an estimate as a bill of quantities. If you intend to tender the work, finishing the drawings first is genuinely worth the delay — an incomplete bill transfers the missing scope into variations, which is the most expensive way to buy anything.

Need a bill of quantities prepared?

Send the drawings. We will tell you what can be measured from them, what cannot, and what the preparation costs.

Prefer to talk now? Call +254 742 147 558.