Architectural Design · Kenya

Architectural Design Companies in Kenya

Design developed with its own structural engineering and its own cost measurement — so what you approve on paper is something that can be built, for a figure you have already seen.

Service lines under one contract
7
Incorporated in Kenya
Est. 2017
Engineering disciplines in-house
3

Start a design conversation

Four fields. You'll hear back within one business day, from someone who can answer technical questions.

No obligation, and your details are not shared with anyone.

Registered and compliant with

  • National Construction Authority
  • National Environment Management Authority (NEMA)
  • Engineers Board of Kenya

The gap in most design appointments

A beautiful drawing is not the same as a buildable one

The most expensive moment in a lot of Kenyan projects is the one where a finished design meets its first real price. Months of work, a scheme everyone has grown attached to, and a figure well beyond what the client had in mind. What follows is value engineering, which is a polite name for cutting things out of a design that was never shaped around the budget.

It happens because design and cost are usually separate appointments running in sequence. The architect draws, then the quantity surveyor prices, then everyone reacts. Nothing about that sequence is wrong except the order.

TopHall Group runs architectural design alongside structural engineering and quantity surveying, all in-house. Schemes get measured while they are being drawn. You see what a decision costs at the point you are making it, not four months later.

What clients tell us went wrong last time

Five ways design appointments disappoint

None of these are about talent. They are about how the work is organised.

  • A scheme designed past the budget

    Costing after the design is finished means discovering the problem when changing it is most expensive. We measure as we draw.

  • Structure imposed on the architecture late

    Column positions that arrive after the layout is fixed either spoil the plan or make the frame inefficient. Here they are developed together.

  • Drawings a site team cannot build from

    Presentation drawings are not construction drawings. What matters on site is sections, details and schedules — and whether they answer the questions a fundi actually has.

  • Approvals treated as someone else's problem

    County submission requirements shape the drawings. Finding that out at submission stage means redrawing.

  • A design that ignores where it is

    Orientation, prevailing wind, rainfall, slope and how the plot is actually accessed change a good design into the right one.

What we design

From concept to construction drawings

Residential, commercial, institutional and mixed-use, with the engineering attached.

  • Architectural Design

    Concept, spatial planning, elevations and the development of a scheme into full construction drawings.

  • Structural Design

    Reinforced concrete and steel design developed with the architecture, so the frame supports the plan instead of fighting it.

  • Cost Measurement

    Quantities measured as the design develops, so the budget is a live number rather than a verdict delivered at the end.

  • Environmental Documentation

    EIA project reports and environmental management plans where the development requires them, prepared alongside the design.

  • Water & Drainage Design

    Rainwater harvesting, drainage, septic systems and borehole provision designed into the scheme rather than added to it.

How a design runs

Six stages, each one signed off

You never move to the next stage without knowing what the last one costs.

  1. Brief

    What the building has to do, for whom, on which site, within what budget.

  2. Site analysis

    Orientation, slope, access, services, ground conditions and the county's development control for that zone.

  3. Concept design

    Spatial arrangement and massing, with an early cost range so the direction is affordable before it is detailed.

  4. Developed design

    Architecture, structure and services resolved together, measured into a bill as the drawings firm up.

  5. Approval documentation

    The technical drawings and documents the county submission requires, prepared to their format.

  6. Construction drawings

    Sections, details, schedules and bar bending — the set a site team builds from.

Why TopHall

What having the engineering in the same building changes

It changes the sequence, and the sequence is the whole problem.

  • Cost visible while you are deciding

    Quantity surveying is one of our own service lines, so a design option can be priced in days rather than becoming a separate appointment.

  • Structure designed with the plan

    Column grids and spans are resolved alongside the layout. Nothing has to be un-designed later to accommodate a beam.

  • Drawings produced by people who supervise sites

    The same practice runs construction, which is why the details answer site questions instead of generating them.

  • Environmental work in-house

    EIA and environmental management planning are services we sell in their own right, so the statutory side is programmed rather than outsourced late.

  • You can stop at any stage

    Design is available as a standalone appointment. Taking us on to build afterwards is an option, never a condition.

Our work

Schemes developed to visualisation

Design visualisations produced by our team, and a photograph from a TopHall site. Each is captioned for what it is.

  • Architectural visualisation of a modern two-storey family home with white render, stone-clad columns, large glazed openings and a roof pergolaDesign visualisation

    Two-storey family home resolved to visualisation — massing, glazing proportions and material treatment settled before construction drawings.

  • Architectural visualisation of a single-storey bungalow with a pitched tiled roof and covered entrance porchDesign visualisation

    Single-storey bungalow with pitched roof and covered entrance, developed at design stage.

  • Masonry walls under construction rising from a natural stone strip foundation on a building siteSite photograph

    The same kind of work under construction — masonry superstructure rising off completed foundations.

Before you call

What clients ask about design

How much does architectural design cost?

Design fees are normally a percentage of the construction cost, so the honest answer depends on what you are building. What we can do quickly is tell you the likely construction cost range for your brief on your site, which is the number the fee follows from — and which is also the number worth knowing before you commit to anything.

Can I use your design and build with someone else?

Yes. Design is a standalone service and the drawings are yours. We will also give you a measured bill of quantities if you want one, which makes comparing contractor quotes considerably easier because they are all pricing the same document rather than their own interpretation of it.

Do you handle the county approval submission?

We prepare the technical drawings and documentation the submission requires and programme it alongside the design, so it is not discovered as an obstacle later. The approval itself is granted by the county and its timing belongs to them. What we control is that the submission is complete and correct when it goes in.

Have a site and an idea?

Tell us what you want to build and what you can spend. We will tell you honestly whether the two fit before you commit to a design.

Prefer to talk now? Call +254 742 147 558.